Geomembrane for waterproofing

HDPE geomembrane, full name of high density polyethylene film, is a waterproof barrier material produced by (medium) high density polyethylene resin. Its density is 0.94g/cm³ or above, and it has a variety of excellent properties and characteristics, and is widely used in various seepage prevention projects.


Support bulk ordering with favorable prices.

Support ODM/OEM.

The factory has stock and fast delivery.

Delivery Time: 10-20 working days

Minimum Order Quantity: 300 square meters

Payment Term: 30% T/T Deposit, 70% T/T Before Shipping


Contact Now E-Mail Telephone WhatsApp
Product Details

Product Details:

Geomembrane is a kind of waterproof barrier material based on high polymer. It is mainly divided into low density polyethylene (LDPE) geomembrane, high density polyethylene (HDPE) geomembrane and EVA geomembrane.


Features:

1. Complete width and thickness specifications.

2. Excellent environmental stress cracking resistance and excellent chemical corrosion resistance.

3. Excellent chemical corrosion resistance.

4. It has a large temperature range and a long service life.

5. Used in landfill, tailings storage, channel seepage prevention, dam seepage prevention and subway engineering.

Hdpe liner.jpg

Technical Data:

Mechanical Properties

Properties

Unit

Product Specification

Test Frequency

Thickness

mm

0.75

1.00

1.50

2.00

2.50

3.00

Per roll

Density

g/cc

0.94

90,000kg

Tensile Properties

yield strength

break strength

yield elongation

break elongation

kN/mkN/m%%

11

20

12

700

15

27

12

700

22

40

12

700

29

53

12

700

37

67

12

700

44

80

12

700

9,000kg

Tear Resistance

N

93

125

187

249

311

374

20,000kg

Puncture Resistance

N

240

320

480

640

800

960

20,000kg

Stress Crack Resistance

hr.

500hr.

perGRIGM-10

Carbon Black Content

%

2.0-3.0%

9,000kg

Reference Properties

Oxidative Induction Time

aStandard OIT

bHigh Pressure OIT

min

100min.

500min.

90,000kg

Oven Aging at 85 Cretained after 90days

aStandard OIT-

bHigh Pressure OIT-

%

55%

80%

per each

formulation

UV Resistance High Pressure OIT-%retained after1600hrs

%

50%

per each

formulation

Melt Indexcondition190°C2.16kg


0.20g/10min


Construction precautions:

Geomembrane in the transportation process do not drag, hard pull, to avoid sharp objects stabbing.


1, should be extended from the bottom to the high, do not pull too tight, should leave a 1.50% margin for local subsidence and stretching.

2, the longitudinal joints of the two adjacent pieces should not be on a horizontal line, should be staggered more than 1m.

3, the longitudinal joint should be more than 1.50m away from the dam foot and bend foot, and should be located on the plane.

4, the first slope behind the bottom.

5, when the slope is laid, the film direction should be basically parallel to the maximum slope line.



Our other products:

1734672343268972.png      1734672859641878.jpg   1734672886433368.jpg

Ecological Geobag        Blind Drainage Ditch       Hdpe geocell



Packed and wrapped by non-woven cloth

Q&A:

Q: What can you buy from us?

A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite, and so on.

Q: Can I have a sample?

A: Yes.  And sample free.

Q: What's the payment terms?

A: T/T or L/C.  Others could be negotiated.


Leave your messages

Related Products

x

Popular products

x
x